Up Progress Photos » S October 08 » 10.21.08

Temp handrail at hillside upper landing
Temp handrail at lower level
Shed cleared for parking area grading
Office is gone for area grading
IMG_7526
Permanent telephone line is pulled into house coming out of conduit at base of pole
Bamboo on hill
Steps at base removed for final
Neighbors slope is sloughing some
IMG_7533
IMG_7534
IMG_7535
IMG_7536
IMG_7537
IMG_7538
IMG_7539
IMG_7540
IMG_7541
IMG_7542
IMG_7543
Before regrading for parking area
IMG_7545
Temp door to lower level for final
Temp wall at base of stair for final
Temp wall at base of stair for final 2
Aluminex door installed at lower level
Fireplace closed off for final
Temp handrail and guardrail at steel stair
New Jenn-air kitchen hood
Whole hillside with stair at base removed for final
Temp guardrail at steel stair
Aluminex door installed at roof glass box