Up Progress Photos » N May 08 » 05.20.08

Why does the yard keep ending up looking like this
Preping self supporting entry slab formwork
First floor east roof eave
First floor hall lights
Main panel circuits are many
Main panel in laundry room
Running wire for living room floor boxes
Rebar grid for entry slab
Living room getting ready for slab pour
Laying out stair tower landings and treads
Rene getting ready to walk the plank
Basement hall after polishing slab
Basement bath shower floor with slope poured into slab
Basement bedroom polished slab and wall lines marked
Basement stair tower wall and polished slab
Basement slab polished looking north
Radiant pipes in basement mechanical room

17 Images | © JAlbum & Chameleon | Help