Modifying K12 barbacks for extra handlebar sweep

Previous   Index   Next

14. Now it's time to mark for the grooves. Wrap the area to be ground with electrical tape, taking care that it's smoothly affixed to the surface with no bubbles. also cut a hole through the tape to allow the bolt to pass through.