news
- 09/2009 CMI passes initial registration audit for ISO 9001:2000 registration and is being recommended by BSI.
11/2008 CMI adds (2) 85 Ton Negri Bosse injection molders.
08/2008 CMI adds a CMM to the quality department giving us improved precision measurement capabilities.
06/2008 CMI adds a state of the art 140 ton Negri Bosse injection molding machine.
02/2008 CMI begins construction on a 10,000 sq. foot expansion.
07/2007 CMI opens 3rd shift, commencing a 24/5 schedule.
05/2007 CMI added (2) 2 shot Engel 300 ton machines giving us the ability to run two shot injection molding.
02/2007 CMI added a 200 ton Battenfeld injection molding machine.
01/2007 CMI teamed up with Molds Unlimited adding on-site tooling capabilities.
10/2006 CMI added Pad Printing Equipment which gives us the ability to provide in house decorating of plastics.
10/2006 CMI added (2) 80 ton Engel injection molding machines.
07/2006 CMI moved from its location in Everett to a new facility in Woodinville. The new facility doubles our manufacturing space and provides additional room for expansion.